About the article

THE INTERACTION OF PROCESSES OF TESTING LABORATORY MANAGEMENT SYSTEM ACCORDING TO THE GOST ISO/IEC 17025-2019 REQUIREMENTS

DOI: 10.46573/2658-5030-2020-3-107-112

Download article

Authors

S.S.S. AL-BUSAIDI, S.V. PONOMAREV, Dr. Sc.

Abstract

The execution order of the processes of the management system (MS) of the testing laboratory (TL), certified according to the requirements of the standard GOST ISO / IEC 17025-2019, is discussed. It was established that the process “8.9 Management Review” is the main process in managing activities in a testing laboratory. The interaction of this process with other MS TL processes is considered, in particular: “6.2 Personnel”, “6.4 Equipment”, “6.5 Metrological traceability”, “7.2 Selection, verification and validation of methods”, “7.6 Evaluation of measurement uncertainty”, “7.7 Ensuring the validity of results”, “7.10 Management of inappropriate work”, “8.5 Actions related to risks and opportunities”, “8.6 Improvement”, “8.7 Corrective actions”, “ 8.8. Internal Audits”, etc.

Keywords

production control, monitoring, risks, opportunities, data analysis, management reviews, corrective actions, improvement.