About the article

EVALUATION OF SOLUTIONS DURING PRE-PRODUCTION

DOI: 10.46573/2658-5030-2023-2-94-101

Download article

Authors

G.B. BURDO, Dr. Sc., A.N. BOLOTOV, Dr. Sc.

Abstract

It is shown that the specifics of single and small-scale instrument-making and machine-building production presupposes the implementation of a significant number of contracts at the same time, which implies simplified, and not always adequate, technical preparation of production. The basic principles of organizational and technological design are revealed, the set-theoretic and time models of the production system are analyzed, which allows identifying criteria during technological preparation. The subjects and objects of the production system and time points for determining the specified criteria are established. It is shown that the set-theoretic model of the procedure for establishing criteria for technological preparation of production reflects the information structure of the production system, and the time structure ensures synchronization of the procedures performed in time.

Keywords

computer-aided design of technological processes, technological preparation of production, artificial intelligence, objective function, unified information space, system approach.