O.V. PUKHOVA, K.L. SHAKHMATOV, K.Yu. ZHENIKHOV
The article considers the issues of reducing energy capital costs in the field production of lump peat. It is noted that the layer-by-layer slit method based on the method of mechanized extrusion molded cylindrical lumps directly at the technological sites of extraction with subsequent drying and harvesting operations. In the process of lumps production by milling-forming method it was found that the extraction is a very energy-consuming technology, so the question of reducing the costs of its production appeared. It is indicated that during milling molding, substantial loads act on the knives of the working body of the milling unit during extrusion and cause their deformation and then destruction, as a result of which the power consumption for molding increases, and thus the productivity and reliability of the unit are reduced. Specific work and required power for milling and molding are calculated, as well as the minimum tractor power required to perform the operation of milling and molding is determined. It is stated that in order to improve the technical and economic characteristics of the lump peat peat extraction site, the complex evaluation indicator was used, which allowed to select low-power equipment, thereby reducing operating and capital costs and increasing the profitability and reliability of production.
lumpy peat, peat deposit, extraction, energy consumption, milling, profitability.