About the article
A.A. ANDRIANOVA, А.L. YABLONEV
Reclamation of depleted peat deposits is an important economic task. Modern reclamation methods generally involve flooding and irrigating the areas. Irrigated areas can be used for the reproduction of valuable fish species using incubation systems designed for use in flowing water. Corrugated PVC pipes are the most suitable for supply pipes. The experimental determination of critical velocities and critical Reynolds numbers, conducted in this study, will enable future hydraulic calculations for incubation systems.
depleted peat deposit, flooding, stocking, incubation system, corrugated PVC pipe, critical velocity, critical Reynolds number.